January 2017

Work is complete on the $120,000 upgrade at Clifton Hill Peace Park, Annerley and the park is now open for use.

All play equipment, including the new large fort, swings and see-saw have been installed, as well as the new tap, bubbler and dog bowl combination.

The shade sail and BBQ are to be installed at a later date.

Thank you again to all those who gave feedback. The playground looks great and will be a wonderful space for local children.

 


December 2016

Work has begun on the $120,000 upgrade to the park and play equipment at Clifton Hill Peace Park, Annerley.

The upgrade includes the following:

a new large fort

shade sails

a BBQ

new swings

see-saw

spinner

The works will also include the replacement of the existing drinking fountain with a combination of a tap, bubbler and dog bowl. The footpath has also been approved for resurfacing, which is great news.

Work on the park began on Thursday 8 December and should be completed by Christmas. Thank you again to all those who gave feedback.

 


September 2016

I have received great feedback from residents regarding the allocated $120,000 Clifton Hill Peace Park playground upgrade. Thank you to all  who provided your comments – this has been a truly consultative project from the namechange through to the park upgrade.

I received overwhelming support for option three, which included a larger fort and less stand-alone equipment. You can find a copy of the design below.

Some changes were made to the design after consultation, which include:

  • a baby seat included in the swing set, so it will include a basket, normal seat and baby seat
  • the balance beam be swapped for a see-saw
  • the spinner bowl be swapped for a spinner

Other suggestions received were:

  • the fort be oriented to the shelter sheds
  • a recycling bin to go into the park next to the existing general waste bin
  • water runoff be diverted from the playground into the garden
  • new trees planted
  • extra seat between the playground and Eric Cres either to capture shade from sail or under the tree between the shelter and Eric Cres

Council is currently costing resurfacing of the footpath within the park and I know this is a priority from a safety point of view. I am hoping we can find a way to include the upgraded footpath this year. At this stage there are not enough funds in the current year for additional seating but we can make this and the adult exercise equipment part of a stage two upgrade in future years.

The upgrades should be completed by Christmas. Thank you again to all those who gave feedback.

 


July 2016

This year $120,000 has been allocated to upgrade the park and play equipment at Clifton Hill Peace Park, Annerley. The upgrade includes, by popular demand:

a double shade sail to cover the entire playground area;

a new BBQ near the shelter shed;

sensory play equipment;

swings; and

a climbing fort aimed at children aged between 2 and 8 years.

The playground options include a smaller fort and more stand alone equipment or a larger fort and less stand alone equipment. Depending on budget, elements of the equipment in both options are interchangeable. To view both options in more detail, please visit the links below.

Council is currently costing resurfacing of the footpath within the park and I know this is a priority from a safety point of view. I am hoping we can find a way to include the upgraded footpath this year. At this stage there are not enough funds in the current year for additional seating but we can make this and the adult exercise equipment part of a stage two upgrade in future years.

To have a say about the playground equipment, please come along to:

Annerley Neighbourhood Watch 5 at 7pm Monday, 8 August, St Aidan’s Church

Chat with Nicole at her community corner at 10am Saturday, 13 August at Clifton Hill Peace Park. 

If you can’t make it in person please email your feedback through to my office at tennyson.ward@bcc.qld.gov.au.

I look forward to hearing from you.

Option One

Option Two